The last (and biggest) project at our new house was the outside renovation, planned by landscape architect Rebecca Knapp and executed by contractor Vu Truong
1. BEFORE (the main challenge was the short setback (11 feet sidewalk to door) but steep rise (~6 feet vertical sidewalk to door) 2. AFTER (more plantings will be done in the spring) 3. AFTER Below are images in chronological order The project started in early August, but wasn't completed until early November. (105 images total) 4. Plants were removed 5. Ground was cleared 6. 7. La Jefa 8. 9. the wall beside the fireplace was removed 10. trench for wall along side of house 11. 12. 13. demolition of the stairs and porch was a challenge 14. trenching for wall along sidewalk 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. excavation for stairs begins 30. 31. 32. 33. 34. footers 35. bricks arrive from Pueblo 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. Lucio (alban~il = mason) and Bill 51. 52. 53. Wood for the back fence 54. 55. 56. ready for stairs 57. 58. 59. 60. 61. 62. 63. 64. East side of house (unfenced; where we will plant a half dozen fruit trees. The satellite dish is nonfunctional) 65. back fence posts are set 66. 67. 68. 69. 70. 71. 72. 73. 74. 75. 76. 77. 78. 79. 80. 81. 82. 83. 84. 85. 86. the curved wall on the right needed additional attention 87. the arbor is done 88. 89. 90. all done! 91. 92. 93. 94. 95. 96. 97. 98. 99. 100. 101. 102. 103. 104. view from porch across 35th Avenue 105. farther east on 35th |