Aaron spent less than 2.5 hours hauling and stacking all of the logs into two piles - one on lot 2 and one on lot 3
19 images 1. Aaron worked his way downhill 2. 3. 4. Lot 2 is ready for excavation to begin 5. 6. 7. 8. fetching the last load on lot 2 9. all clear for a foundation 10. 11. the forest swatch is also clear 12. 13. moving on to lot 3 14. 15. 16. 17. Lot 3 is now ready for excavation 18. 19. back at lot 2, looking at the log cabin |