Ready for pouring the foundations on Lots 2 and 3; excavation on Lot 7
All forms are in place on both Lot 2 and Lot 3 for pouring the foundation walls. I saw Paul, who said that they plan to pour TODAY at 1pm!

21 images
1. Somebody has been messing with the transformer at the bottom of the log cabin driveway, getting ready to bring power to Lot 2 (not sure why they won't use the line that is already in place). Paul said that they never use old infrastructure, always new. Still not sure why they are tapping this transformer, and not the one near the Johnson's driveway. Scott (crew foreman) made sure that they dug the trench deep (about 3'), so that if we ever want to put a culvert across the end of the driveway, it won't interfere with t he electric.



2. view towards Lot 2

4. Lot 2

5. Lot 2

6. Lot2

7. Lot 2

8. Lot 2

9. Lot 2 from the driveway - that foundation wall is going to be pretty tall

10. Entrance to Lot 3

11. Lot 3

12. Lot 3

14. Looking uphill at Lot 3

15. Uphill at Lot 3

16. Lot 3

17. view of Lot 7 (Rapp's) from the bench

18. Lot 7 - big footprint! Basement will be in the lowest area (crawl space on far side)

19. Lot 7 driveway

20. Lot 7 from wellhead

21. Probably ready for footers if it ever dries out. Paul said that they were ready to do the footers, when an inch of rain fell Saturday night. So they will be set back a while.