The foundation forms came off, and after the concrete is waterproofed and the window wells placed, backfilling can begin
14 images ![]() 2. The forms did their work, and now are loaded back on their trailer ![]() 3. ![]() 4. view from inside basement ![]() 5. ![]() 6. view towards Lot 3 ![]() 7. window wells and foundation forms ![]() 8. ![]() 9. ![]() 10. ![]() 11. temp electrical is set (find Zippy) ![]() 12. inspector #1 ![]() 13. view up to Lot 3 ![]() 14. Rapp's lot is still pretty wet ![]() |