The foundation forms came off, and after the concrete is waterproofed and the window wells placed, backfilling can begin
14 images 2. The forms did their work, and now are loaded back on their trailer 3. 4. view from inside basement 5. 6. view towards Lot 3 7. window wells and foundation forms 8. 9. 10. 11. temp electrical is set (find Zippy) 12. inspector #1 13. view up to Lot 3 14. Rapp's lot is still pretty wet |