The stage is set
All 7 modules are delivered, both foundations are backfilled, the drives are compacted for the crane, which is due to arrive at 7:30 toniight. Paul said he would be here at 5:30 AM tomorrow

39 images
1. There were 5 modules at the ranch when I arrived today. I was taking a load to the landfill, when what should I see approaching...

2. The last two modules! (on the highway near Everist)

3.

4.

5.

6. Back on the ranch, I photographed the seven modules. I haven't a clue whose is whose.

7.

8.

9.

10.

11.

12. This one is on W's driveway, and Marshall joked that if he shows, he (W) will claim it and he (MM) will use it as a new woodshop.

13. unhooking

14.

15.

16.

17.

18.

19.

20.

21.

22.

23. the road to the lots

25. Lot 2 - not a bad view. Mark and 2 guys were compacting the drive for the crane

26. Lot 2

27. the road to Lot 3

28. Driveway to Lot 3

29. All backfilled now

30. Lot 3

31. the pitless was installed, and the ditch filled

32. veiw from well

33. front

34.

35. french drain exit

36. Lot 3

37. walking back uphill

38. Lot 2

39. Lot 2