All 7 modules are delivered, both foundations are backfilled, the drives are compacted for the crane, which is due to arrive at 7:30 toniight. Paul said he would be here at 5:30 AM tomorrow
39 images 2. The last two modules! (on the highway near Everist) 3. 4. 5. 6. Back on the ranch, I photographed the seven modules. I haven't a clue whose is whose. 7. 8. 9. 10. 11. 12. This one is on W's driveway, and Marshall joked that if he shows, he (W) will claim it and he (MM) will use it as a new woodshop. 13. unhooking 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. the road to the lots 25. Lot 2 - not a bad view. Mark and 2 guys were compacting the drive for the crane 26. Lot 2 27. the road to Lot 3 28. Driveway to Lot 3 29. All backfilled now 30. Lot 3 31. the pitless was installed, and the ditch filled 32. veiw from well 33. front 34. 35. french drain exit 36. Lot 3 37. walking back uphill 38. Lot 2 39. Lot 2 |