roofing and siding
In the 3.5 weeks since the cabins were set, there hasn't been any finishing work inside, except for the basements, which are now ready for concrete pouring for the floors. Outside, roofing progress has been made, and most of the siding is now in place

50 images
I took a walk around the houses, counter-clockwise, at about 4pm. Lot 2 has a leach field.