The basement floors and deck footings were poured on Tuesday. Lumir has been installing furnaces. Nothing done inside (upstairs) on either lot (much progress on Rapp's garage)
10 images 2. Entry to basement, Lot 2 3. basement, Lot 2 4. furnace, Lot 2 5. Propane on Lot 3 (there is also a tank on lot 2) 6. Septic tank on Lot 3 - no excavation yet for the leach field 7. deck footings on lot 3 8. Lot 3 basement 9. Lot 3 basement 10. Lot 3 basement |