During the past week, basement stairs were constructed in each cabin, plus some framing in Lot 2 basement. The Lot 2 deck was begun, and the Lot 3 leach field was begun.
14 images 2. Lot 3 3. 4. Lot 3 leach field berm 5. Lot 3 6. Lot 3 septic tank 7. Lot 2 deck 8. Lot 2 basement stairs and framing 9. Lot 2 10. Lot 2 11. Lot 2 deck 12. Lot 2 deck 13. Lot 2 deck 14. Lot 2 leach field berm |