Some progress is evident on the two cabins. But first, three sagas on the road, which was incredibly slippery this afternoon. The Boscarellos couldn't make it up, and Dennis Heagney stopped to help. He got out, and a short time later (he estimates 7-8 minutes) his car (empty, in Park) started to slide, and spun right off the road. Meanwhile, the Boscarellos made it down the hill, but with a flat tire and no jack. We arrived, and brought them to the cabin to call AAA. Then Bill took the Boscarellos back down, and on the way passed another 2-wheel drive car going up. Uh-oh.... And sure enough, as Bill drove back up after dropping off the Boscarellos, there on the steep hill was that car, sideways on the road. So he helped push (by hand) them around. They then drove to town, bought tire chains, and showed up at the cabin (invited earlier) for a cup of tea as sunset approached. Then they headed out to winter camp up the valley! Kelly are Cole are a young couple from Boulder who were cheerfully undaunted by their saga.
28 images 2. 3. Here comes Dennis' car an hour later 4. ouch! 5. OK, on to the cabins. Here is Lot 3, with deck a-building 6. Lot 3 furnace and electric box, hopefully post-successful inspection 7. Lot 3: tiles moved from log cabin 8. Lot 3: the four pieces are being stitched together with drywall 9. Lot 3 stitching 10. Lot 3 stitching 11. Lot 3 stitching 12. Lot 3 deck joists in place 13. Lot 3 roof over porch being built 14. Lot 3 stitching 15. Lot 3 stitching 16. Lot 3 decking delivered 17. Lot 2 deck work progressing 18. Lot 2: Pedro (below) and his son Felix. Pedro was staining deck joists and Felix was putting in roof rafters 19. Lot 2: staining deck joists 20. Lot 2: stitching inside 21. Lot 2: stitching inside 22. Lot 2 deck ceiling rafters 23. Lot 2 stitching 24. Lot 2 deck roof 25. Beautiful day, gorgeous views 26. 27. Lot 2 stitching 28. Lot 2 decking delivered |