The cold snap kept outside progress to a minimum, but almost all of the drywall was finished in both cabins (not basements)
35 images 2. Lot 3: drywall finishing 3. Lot 3: drywall finishing 4. Lot 3: drywall finishing 5. Lot 3: drywall finishing 6. Lot 3: drywall finishing 7. Lot 3: drywall finishing 8. Lot 3: drywall finishing 9. Lot 3: drywall finishing 10. Lot 3: drywall finishing 11. Lot 3: drywall finishing 12. Lot 3: drywall finishing 13. Lot 3: drywall finishing 14. Lot 3: drywall finishing 15. Lot 3: drywall finishing 16. mountains still shrouded in cold, cold clouds 17. Lot 3: staining of deck joists 18. Lot 3: drywall finishing 19. Lot 3: former egress/ingress portal now with window 20. Lot 3: drywall finishing 21. Lot 2: roof over deck coming along 22. Lot 2: drywall finishing 23. Lot 2: drywall finishing 24. Lot 2: drywall finishing 25. Lot 2: drywall finishing 26. Lot 2: drywall finishing 27. Lot 2: drywall finishing 28. Lot 2: drywall finishing 29. Lot 2: drywall finishing 30. Lot 2: drywall finishing 31. Lot 2: drywall finishing 32. Lot 2: drywall finishing 33. other side of the tracks.... 34. Lot 2: top stair installed 35. Lot 2: basement window installed |