Tiling continued, as did some deck work. Lumir installed the water heaters
16 images 2. Lot 2: bathroom tiles 3. Lot 2: tiles 4. Lot 2: decking is attached 5. Lot 2: 6. Lot 2: 7. Lot 2: view from deck 8. Lot 2: 9. Lot 2: water heater and something suspended from the ceiling 10. Lot 3: deck railings removed (!) 11. Lot 3: master bedroom flooring partially completed 12. Lot 3: 13. Lot 3: Electricity on at both cabins 14. Lot 3: door to basement installed 15. Lot 3: water heater and mystery suspended thing 16. Lot 3: railing sections were snugged up with comealongs |