Flooring, deck railings, electrical, heating progress
This is in 2 parts - Jan 10 (first) and Jan 7 (second)

13 images
1. Lot 2: the siding under the porch roof has been finished

2. Lot 2: that big rectangular box is all about bringing in fresh air. The foil-wrapped pipes will make for a lower ceiling

3. Lot 2: living room flooring starting

4. Lot 2

5. Lot 2: master bedroom

6. Lot 2

7. Lot 2

8. Lot 2

9. Lot 3: deck railings have been replaced

10. Lot 3: counter tops installed

11. Lot 3

12. Lot 3: Basement ceiling being readied for drywall (both cabins have passed electrical inspection)

13. Lot 3


Flooring and deck railing progress (7 January 2014)

There were lots of cars parked at Lot 2, but only 1 at Lot 3 today

22 images
1. Lot 3:

2. Lot 3:

3. Lot 3: Aaron and another fellow were doing the flooring. It was nearing completion in the Lot 3 cabin

4. Lot 3: living room

5. Lot 3: bathroom

6. Lot 3:

7. Lot 3: kids' bedroom

8. Lot 3:

9. Lot 3: bathroom

10. Lot 3: basement, with lots of electrical wires dangling

11. Lot 3

12. Lot 3: living room

13. Lot 3

14. Lot 3: deck railings being rebuilt

15. Lot 3 cabin in the sunshine

16. Lot 2: lots of cars today, but no sign of any progress inside

17. Lot 2: deck railings

18. Lot 2

19. Lot 2: stringers for deck stairs

20. Lot 2: installing siding

21. Lot 2 cabin in the sunshine

22. both cabins