Lot 2 gets C.O. Lot 3 has more work to do
Lot 3 has its C.O. but attempts to deliver furniture faltered as the delivery truck got stuck on the hill.

13 images
1. The log cabin deck gives an idea of snow depth

4. Lot 3: stair treads and risers

5. Lot 3: drywall to the basement

6. Lot 3: drywall finishing in basement

7. Lot 3

8. Lot 3

9. Lot 3

10. Lot 3: It amazed me that the deck was cleared so completely with a single-stage snow blower. I would like to have seen it. There must have been two feet of compacted snow on the deck.

11. Lot 3

12. Lot 3

13. Lot 3